shaydeeramirezowyd0d shaydeeramirezowyd0d
  • 12-12-2018
  • Mathematics
contestada

a contractor is mixing concrete and mixed 3 parts concrete and 9 parts water. How much water is needed for 12 parts concrete?

Respuesta :

sakie329 sakie329
  • 12-12-2018

Answer:

36 parts water

Step-by-step explanation:

3/9 = 1/3 = for every 1 part concrete, it's 3 parts water.

12/x = 1/3; x = 36

so, 12 x 3 = 36

Answer Link

Otras preguntas

Which statement is the best example of the principle of rule of law? The president has the right to veto a law. New laws are enacted by popular vote. Laws sho
Solve for the variable in the following inequality. n - 6 ≥ -2 HINT: find the value for n, which would make the inequality true.
Answer yes or no to determine whether 268 is divisible by each number: 2 3 4 5 6 9 10
Which statement correctly describes a difference between se xual and ase xual reproduction? A. Se xual reproduction only happens in animals, while as exual repr
Use each digit once make the smallest 4-digit number 3926
consider the role of media in shaping American public opinion and action. To what extent did Yellow Journalism lead to war with Spain? What benefit did the news
Family of orientation is the family that you create with a partner. True False
In the next election, 15,000 people will actually vote for Candidate A. A poll has a percent error of 4%. Which statement describes what number of people voting
What impact did oral traditions have on Africa’s history
What is the main idea of the second samurai poem?