shermmic2023 shermmic2023
  • 12-11-2019
  • History
contestada

For what project would a government leader most likely use a cost-benefit analysis

Respuesta :

rachel2005smith
rachel2005smith rachel2005smith
  • 12-11-2019

Answer:

Explanation:

The projects that a government leader most likely use cost-benefit analysis are the type of technology used within the school, the equipment needed in the cafeteria to provide healthy or unhealthy lunches, the equipment needed for art facilities within the school

Answer Link

Otras preguntas

In the late 20th century , the green revolution had the greatest impact on
What is the name of the biome in which you can encounter an elephant (in natural environment of course)
How to calculate 30% of 1500??
sedimentation as a method of water purification results in what
Find the difference. 7 7/8 - 3 1/4 ?
Joseph has a coin and a number cube. The number cube is labeled 1 -6. He flips the coin once and rolls the number cube once. What is the probability that the co
How to calculate 30% of 1500??
What is three ratios equivalent to 18:4
During football game, Kevin gained five yards on the first play. Then he lost seven yards on the second play. How many yards does Kevin need on the next play to
How do human diseases caused by bacteria and diseases caused by viruses react to antibiotics?