jrodriguez245 jrodriguez245
  • 12-12-2019
  • Mathematics
contestada

a construction crew must build 4 miles of road in one week.
on Monday, they build 1/2 miles of road. on Tuesday, they build 1/3 miles of road.
how many more miles of road are left to build

Respuesta :

wdwaddy567
wdwaddy567 wdwaddy567
  • 12-12-2019
3 1/6 because 1/2+1/3 is 5/6 and 4- 5/6 is 3 1/6
Answer Link

Otras preguntas

How does Silicon shape our technological reality
What number is shown with these blocks
Out of these three which of the following types of people would be unlikely to do much to change themselves? a. the fair-weather liberal b. the timid bigot c.
why did socialism appeal to some americans in the late 1800s?
In 500 b. c. the Roman government was beginning to form what would become a republic. a. True b. False
millie has a box of 1 hundred cubes. she also has a bag of 70 cubes. how many trains of 10 cubes can she make?
_____ is considered the "Father of History." Herod Herodotus Helio
The current U.S. government is an example of: a. unitary system b. representative democracy c. confederate system d. oligarchy
The French and Indian War was the final colonial war between France and England. a. True b. False
How does a presidential primary election differ from a general election