freddyayala1002 freddyayala1002
  • 15-10-2020
  • Computers and Technology
contestada

Linda is a core member of a project. She estimates the cost of the project, creates project requirements, and notes risks. What is Linda’s position in the project?

Linda is the project
.

Respuesta :

luisfuentes06elcuh luisfuentes06elcuh
  • 15-10-2020

Explanation:

no linda is the core member not rhe project

Answer Link
narstarolor
narstarolor narstarolor
  • 12-04-2021

Answer:

Project Manager

Explanation:

plato-edmentum

Answer Link

Otras preguntas

What is the equation of a line that passes through (8,-5) and is parallel to the graphed line? In a linear graph line diagram, A line passes through (minus 4, m
why was Maine an ideal location to establish a colony
What had happened on darkstalker's first night of freedom?
The sumof four angles in a pentagon is 440 degrees. Find the missing angle measure
4. Describe the correct use of any equipment used to protect the health and safety of themselves and their colleagues
Explain why the invasion of Iraq during the War on Terror was a controversial issue in 3-5 sentences
2. A barista uses the expression 4.25v + 2.65g to calculate her profit when she sells v, ven and g, grande, beverages. What is the barista's profit, in dollars,
Jimmy asked his friends in his lunch period what their favorite pizza toppings were. The graph shows these results. 30 25 20 15 10 Favorite Pizza Toppings Chees
What type of poet was William Wordsworth?
Francesca and her family traveled out of state to visit family members. The first day they drove 238 miles. The second day they drove 55 more miles than the fir