ellisa31
ellisa31 ellisa31
  • 12-01-2021
  • Spanish
contestada

4 persons can do a job in 5 days, if 8 persons do the same job how much time they will take to complete the same job​

Respuesta :

enrythn
enrythn enrythn
  • 12-01-2021
It’d be faster. That being said, since 4 people take 5 days, 8 people will take half as many days since 4 is half of 8. It will take 2.5 days.
Answer Link

Otras preguntas

what is 57/100 in simplest form
12.52 divided by 2.874 is?
Estimate the total weight of two boxes that weigh 9.4 lb and 62.6 lb using rounding and compatible numbers. Which estimate is closer to the actual total weight
Draw a picture to show the Number 43
Which of the following were most affected by the Great Migration? A) ownership of railroads and steel mills B) African-American literature, music and art C) the
Which hummingbird adaptation is most advantageous for supporting their high metabolism? a. entering torpor b. long beak and tubular tongue c. ability to hover d
“What are two differences between the red and green electromagnetic waves in a rainbow? ”
When matter heats up, dose the molecules close together?
What is the U.S. Mainland part of which plate?
environmental science includes the following field of science