laurennnnnn11 laurennnnnn11
  • 14-01-2021
  • Physics
contestada

A 700N mountain climber scales a 100m cliff. How much work is done by the mountain climber?

Respuesta :

Аноним Аноним
  • 14-01-2021

Answer:

70000N/m

Explanation:

Work is Force multiplied by Displacement.

Multiply 700 by 100 and you get 70000N/m

*Note: N is newtons and m is meters.

Answer Link
Sc0re
Sc0re Sc0re
  • 14-01-2021

Answer: 7000N/m

Explanation: 700 x 100 = 7000

Answer Link

Otras preguntas

Q17 [4 marks]In a class, the ratio of the number of boys to the number of girls is 2:310% of the boys are left-handed15% of the girls are left-handedWhat percen
Stomach activity and the speed at which food moves through the intestines is regulated by:cholecystokinin.O chyme.enzymes.O gastric juices.
Read the excerpt from "The Most Dangerous Game,"by Richard Connell.His foot touched the protruding bough that was thetrigger. Even as he touched it, the general
What were the goals of the Nazis?
О3. To what did Mahatma Gandhi liken anger?WaterElectricityA lionОоPower
solve for x 4(2x-1)-6x 22
Find the perimeter of the Shape below. Give your answer in terms of π
Which of the following claims can be supported by the excerpt?5 pointThe land of Israel was the birthplace of the Jewish people. Here their spiritual, religious
Another strategy to determine if a website is reliable is to "check the domain". How do you check the type of domain that a website is hosted on?O Look at the l
which of the following has the ability to alter authority removal laws