Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 52,000 Total fixed manufacturing overhead cost$291,200 Variable manufacturing overhead per direct labor-hour$5.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 20 Total direct labor-hours 100 Direct materials$780 Direct labor cost$5,200 The unit product cost for Job P951 is closest to