xxmirixd xxmirixd
  • 13-03-2021
  • Mathematics
contestada

Un contratista que se dedica a la construcción de una casa descubrió que debía pagar: $ 1.100 al empapelador y al pintor $ 1.700 al pintor y al plomero $ 1.100 al plomero y al electricista $ 3.300 al electricista y al carpintero $ 5.300 al carpintero y al albañil $ 2.500 al albañil y al empapelador

Respuesta :

jhycimafranca12
jhycimafranca12 jhycimafranca12
  • 13-03-2021

Answer:

1.100+1.700+1=100+5.300+2..500

Answer Link

Otras preguntas

In the standard (x, y) coordinate plane, what is the slope of the line joining the points (3,7) and (4,−8)?
What happens when animals dont reproduce?
A partial deck of cards was found sitting out on a table.If the partial deck consists of 6 spades, 3 hearts, and 7 diamonds, what is the probability of randomly
Okay so I'm trying to find the volume of a sphere with the radius of 3/4k. When I cube 3/4 do I only cube the top number?
name three mountains in the west region.
Which right is more important: freedom of speech or freedom of the press?
RATIO HELP PLEASE1. mrs perry shares out 20 biscuits between gemma and zak in the ratio 1:4. how many biscuits do they both get? 2. mr castle shares out 80 marb
How long did king Arthur served
lakes and oceans have different animal life ?
what should i draw for collage