piolin7882 piolin7882
  • 11-11-2021
  • Mathematics
contestada

If it takes 7 people 8 days to dig a ditch, how many people would it take to dig the ditch in 1/2 day

Respuesta :

homeruser18
homeruser18 homeruser18
  • 11-11-2021

Answer:

112

Step-by-step explanation:

8 days when fitted into a half (1/2) gives you 16

7 times 16 gives the answer of 112 (people needed)

Answer Link
Аноним Аноним
  • 11-11-2021

Answer:

112 people to do it in 1/2 of a day

Step-by-step explanation:

7 · 8 = 56

56 ÷ ½ = 112 people to dig a ditch in 1/2 of a day

Answer Link

Otras preguntas

In 1980,in Great Falls, Montana, temperature rose from -32 Fahrenheit to 15 Fahrenheit in seven minutes.How much did the temperature increase?
how do you find the 19-4c=17
6. What type of relationship involves people who don't share the same status? A. Parallel B. Vertical C. Circular D. Horizontal
3,632,958 standard form
What is the values of the regrouped amounts in 435x17
93x10 written as a whole number
Identify the italicized word as gerund or participle The dog, trained to do tricks, entertained the children for an hour. A.Gerund B.Participle
I need a science scenario that has a control group, a experimental group, and has a testable question
susan is buying supplies for a party. if spoons only come in bags of 8 and forks only come in bags of 6, what is the least number of spoons and the least number
(x to the second power +4x-3) + (x to the second power -6x +1)