In which stage in the project life cycle would crashing likely be performed?

Respuesta :

Erudite1
Erudite1 Erudite1
  • 24-08-2017
Crashing would likely be performed at the CONTROL STAGE in a project life cycle.
Project crashing is a cost reduction method in which the project duration is shortened by reducing the time that it take to execute one or more critical project activities to less than its normal time. In crashing, resources are added to the project by spending the least possible cost.
Answer Link

Otras preguntas

Write essay 250w about your family
ram will complete his work change into present continuous tense​
the polygons are similar. find the scale factor of the smaller figure to the larger figure​
During Anaerobic respiration: A. glucose is converted into Lactic Acid. B. glucose is converted into ATP. C. ATP is converted into Lactic Acid. D. glucose is no
James had a peach that was 98 \text{ mm}98 mm98, start text, space, m, m, end text in diameter. One day he watered it with a magical solution, and it grew to 18
What is the pH of a 2.50×10^-4 M solution of sodium hydroxide
why did the tribal society feel that they need leadership ?​
Can you describe the weather in the northwest united states
Explain how Bacon’s rebellion represented the problems in Virginia.
Do you it is for social studies