duncanreleford
duncanreleford duncanreleford
  • 12-03-2018
  • Physics
contestada

determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

determine the quantity of work done when a crane lifts a 100n and block from 2 m above the ground to a 6 m above the ground class=

Respuesta :

lidaralbany lidaralbany
  • 07-02-2019

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance  = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d

[tex]W = 100\ N\times 4\ m[/tex]

[tex]W = 400 J[/tex]

Hence, the quantity of work done is 400 J

Answer Link

Otras preguntas

Why was Spain successful in re-establishing its control over New Mexico after Popé's Rebellion? A. The Spaniards allied with the Apache tribes to overpower the
Can some one please give me the answers
Receptors located in the upper part of the dermis let you feel ___________ touch.
is this kinetic energy ---> elastic potential energy OR elastic potential energy ---> kinetic energy ??​
At how many points does the graph of the function below intersect the x axis? y= 16x2 - 8x+1
eleza tanzu za mazungumzo​
Understand the impact of time
H20 + C02...................
what type of material is found in the asthenosphere?
how many components are included in the cyclical process when infection occurs due to the presence of pathogens?